CURRENT PROJECTS

Unitil Solar Field – Kingston, NH
ANTICIPATED COMPLETION: Summer 2024

R.S Audley broke ground on the sitework for a new 30 acre solar field in Kingston, NH.

NHDOT 13761E & 13761A F.E. Everett Turnpike Corridor Widening – Nashua-Merrimack-Bedford
ANTICIPATED COMPLETION: Fall 2026

We have currently have two projects on this cooridor. The first project of the NHDOT 13761 project widens the F.E. Everrett Turnpike Northbound & Southbound between Exit 12 and Exit 13. The project will widen northbound and southbound barrels to 3 lanes and includes upgrade to the median barrier system, overhead sign structures, stormdrain system, and construction of a noise abatement wall. 

The second project widens the Turnrpike between exits 8 and 10 and constructs a new bridge over Bowers Pond. 

 

Merrimack, NH – Light Industrial Building
ANTICIPATED COMPLETION: Spring 2024

Working as a sub-contractor to Harvey Construction, RS Audley is performing the site work for a new 100,000 SF Light Industrial Building in Merrimack, NH. This project involves moving over 100k CY of material along with drainage, water, and sewer installation.

Lebanon, NH/Hartford, VT – Bridge Rehabilitation Interstate 89 over Connecticut River
BID AMOUNT: $43,755,824.10 – ANTICIPATED COMPLETION: Fall 2025

This project will rehabilitate the two red list bridges that carry I-89 NB & SB over the Connecticut River between Lebanon, NH and Hartford, VT.

Dover-Rochester, NH – Spaulding Turnpike All Electric Tolls
BID AMOUNT: $23,286,281.15 – ANTICIPATED COMPLETION: Spring 2024

This project consists of converting the two Spaulding Turnpike (NH 16) traditional tollbooth plazas to all electronic tolling facilities. The project also demolishes the existing tollbooth plazas and constructs all associated drainage and roadwork at the two locations. The Rochester location includes the construction of two new soundwalls.

Get In Touch

R.S. Audley, Inc.

1113 Route 3A
Bow, NH 03304

Follow Us