CURRENT PROJECTS

NHDOT 13761E, 13761A, & 16100 F.E. Everett Turnpike Corridor Widening & High Speed Toll Conversion – Nashua-Merrimack-Bedford
ANTICIPATED COMPLETION: Fall 2027

We have currently have three projects on this cooridor. The first project of the NHDOT 13761 project widens the F.E. Everrett Turnpike Northbound & Southbound between Exit 12 and Exit 13. The second project widens the Turnrpike between exits 8 and 10 and constructs a new bridge over Bowers Pond. The third project will convert the current toll booth system to overhead high speed tolls. All three projects will widen northbound and southbound barrels to 3 lanes, upgrade the median barrier system, overhead sign structures, and stormdrain systems.

 

Merrimack, NH – Light Industrial Building
ANTICIPATED COMPLETION: Spring 2024

Working as a sub-contractor to Harvey Construction, RS Audley is performing the site work for a new 100,000 SF Light Industrial Building in Merrimack, NH. This project involves moving over 100k CY of material along with drainage, water, and sewer installation.

Lebanon, NH/Hartford, VT – Bridge Rehabilitation Interstate 89 over Connecticut River
BID AMOUNT: $43,755,824.10 – ANTICIPATED COMPLETION: Fall 2025

This project will rehabilitate the two red list bridges that carry I-89 NB & SB over the Connecticut River between Lebanon, NH and Hartford, VT.

Dover-Rochester, NH – Spaulding Turnpike All Electric Tolls
BID AMOUNT: $23,286,281.15 – ANTICIPATED COMPLETION: Spring 2024

This project consists of converting the two Spaulding Turnpike (NH 16) traditional tollbooth plazas to all electronic tolling facilities. The project also demolishes the existing tollbooth plazas and constructs all associated drainage and roadwork at the two locations. The Rochester location includes the construction of two new soundwalls.

Get In Touch

R.S. Audley, Inc.

1113 Route 3A
Bow, NH 03304

Follow Us