Manchester-Boston Regional Airport – Reconfiguration of TW P & U

This project reconfigures Taxiways ‘P’ and ‘U’ along with the removal of Taxiway ‘A1’. Included in the scope of work is excavation, embankment-in-place, removal of pipes and structures, drainage installation, subbase course construction, basecourse construction, HMA paving, airfield lighting and signage, utility relocations, pavement markings, pavement grooving, and construction of a 14,000 SF retaining wall.

Roxbury/Sullivan, NH – Reconstruction of Route 9

This project reconstructs 2.1 miles of NH Route 9 and replaces the NH Route 9 bridge over Otter Brook. This job will also construct major slope treatments along Route 9 and Bridge Rehabilitation work on the Centre Street Bridge over Otter Brook.

Derry/Londonderry, NH – I-93 Exit 4 Interchange

This project will construct 6 bridges, widen 5 miles of interstate, reconstruct 5 interstate ramps, and re-align NH Route 102 and Pillsbury Street. This is currently the largest project in our history and is connected to our other I-93 Widening project to the south.

Windham/Derry, NH I-93 Widening/Reconstruction

This project involves widening and reconstructing 8 miles of highway and 4 bridges between Exit 3 and Kendall Pond Road on I-93 in Windham/Derry, NH. This project also includes a soundwall and pedestrian box culvert beneath the interstate.